Performs complex engineering task and particularly important engineering work efficiently and accurately
Check and review the contractors submittal of shop drawing for MechanicalElectricalPlumbing woks in compliance with the approved construction drawing and project spsecification as per client requirements and municipality standard.
Reviewed plant load calculation short circuit calculation for additional load of equipment responsible for the installation of Power Transformer MCC control panel with built in protection pumps motors flow measuring instrument
observe site safety procedures and reporting immediately any safety violation.
witness precommissioning final testing and commissioning of all equipment to ensure that all punch lists are completed before any certification is issued. 
SkillsField in Electromechanical works MediumHigh voltage supply installation LVSGMotor Control System MCC Power Transformer Generator Field Instrumentation flow metering deviceSCADA System Micro tunnelingPipeline and Aqueduct.